• Register of Interest Investment in Tasmania’s Renewable Energy Industry

  • Contact Details

  • Format: (00) 0000 0000.
  • Organisation Details

  • Project type (select one or multiple)*
  • Technology type (select one or multiple)*
  • Large energy user type*
  • Questions for Generation projects

    • B.1 Solar section 
    • Solar PV project details

    • B.1.1 Section Collapse (Project 1) - Open 
    • Will your project be developed in stages? If so, please provide details of capacity increases and expected timing.
    • Technology Type*
    • Are you aware of any network upgrades required to facilitate this project, e.g. transformer and/or transmission line upgrades or extensions to existing distribution assets?
    • Do you anticipate installing auxiliary equipment to support operation of the solar farm, e.g. BESS, synchronous condensers etc
    • Development status of your solar project:*
    • Have you secured land access or ownership rights?
    • Planning assessment status of your solar project?
    • What is the current network connection status for your solar project with TasNetworks?
    • Reason for project timeframe
    • Have you entered into negotiations to supply electricity?
    • Do you need to enter into negotiations to supply electricity to proceed with the project?
    • Do you have another solar project to provide details for?
    • B.1.1 Section Collapse (Project 1) - Close 
    • B.1.2 Section Collapse (Project 2) - Open 
    • Will your project be developed in stages? If so, please provide details of capacity increases and expected timing.
    • Technology Type*
    • Are you aware of any network upgrades required to facilitate this project, e.g. transformer and/or transmission line upgrades or extensions to existing distribution assets?
    • Do you anticipate installing auxiliary equipment to support operation of the solar farm, e.g. BESS, synchronous condensers etc
    • Development status of your solar project:*
    • Have you secured land access or ownership rights?
    • Planning assessment status of your solar project?
    • What is the current network connection status for your solar project with TasNetworks?
    • Reason for project timeframe
    • Have you entered into negotiations to supply electricity?
    • Do you need to enter into negotiations to supply electricity to proceed with the project?
    • Do you have another solar project to provide details for?
    • B.1.2 Section Collapse (Project 2) - Close 
    • B.1.3 Section Collapse (Project 3) - Open 
    • Will your project be developed in stages? If so, please provide details of capacity increases and expected timing.
    • Technology Type*
    • Are you aware of any network upgrades required to facilitate this project, e.g. transformer and/or transmission line upgrades or extensions to existing distribution assets?
    • Do you anticipate installing auxiliary equipment to support operation of the solar farm, e.g. BESS, synchronous condensers etc
    • Development status of your solar project:*
    • Have you secured land access or ownership rights?
    • Planning assessment status of your solar project?
    • What is the current network connection status for your solar project with TasNetworks?
    • Reason for project timeframe
    • Have you entered into negotiations to supply electricity?
    • Do you need to enter into negotiations to supply electricity to proceed with the project?
    • B.1.3 Section Collapse (Project 3) - Close 
    • B.2 Wind section 
    • Wind (both onshore and offshore) project details

    • B.2.1 Section Collapse (Project 1) - Open 
    • Will your project be developed in stages? If so, please provide details of capacity increases and expected timing.
    • Technology Type*
    • For offshore wind developments, will connection to the Tasmanian power system be via AC cables or high voltage direct current (HVDC)?
    • Are you aware of any network upgrades required to facilitate this project, e.g. transformer and/or transmission line upgrades or extensions to existing distribution assets?
    • Do you anticipate installing auxiliary equipment to support operation of the wind farm, e.g. BESS, synchronous condensers etc.
    • Development status of your wind project:*
    • Have you secured land access or ownership rights?
    • Planning assessment status of your wind project?
    • What is the current network connection status for your wind project with TasNetworks?
    • Reason for project timeframe
    • Have you entered into negotiations to supply electricity?
    • Do you need to enter into negotiations to supply electricity to proceed with the project?
    • Do you have another wind project to provide details for?
    • B.2.1 Section Collapse (Project 1) - Close 
    • B.2.2 Section Collapse (Project 2) - Open 
    • Will your project be developed in stages? If so, please provide details of capacity increases and expected timing.
    • Technology Type*
    • For offshore wind developments, will connection to the Tasmanian power system be via AC cables or high voltage direct current (HVDC)?
    • Are you aware of any network upgrades required to facilitate this project, e.g. transformer and/or transmission line upgrades or extensions to existing distribution assets?
    • Do you anticipate installing auxiliary equipment to support operation of the wind farm, e.g. BESS, synchronous condensers etc.
    • Development status of your wind project:*
    • Have you secured land access or ownership rights?
    • Planning assessment status of your wind project?
    • What is the current network connection status for your wind project with TasNetworks?
    • Reason for project timeframe
    • Have you entered into negotiations to supply electricity?
    • Do you need to enter into negotiations to supply electricity to proceed with the project?
    • Do you have another wind project to provide details for?
    • B.2.2 Section Collapse (Project 2) - Close 
    • B.2.3 Section Collapse (Project 3) - Open 
    • Will your project be developed in stages? If so, please provide details of capacity increases and expected timing.
    • Technology Type*
    • For offshore wind developments, will connection to the Tasmanian power system be via AC cables or high voltage direct current (HVDC)?
    • Are you aware of any network upgrades required to facilitate this project, e.g. transformer and/or transmission line upgrades or extensions to existing distribution assets?
    • Do you anticipate installing auxiliary equipment to support operation of the wind farm, e.g. BESS, synchronous condensers etc.
    • Development status of your wind project:*
    • Have you secured land access or ownership rights?
    • Planning assessment status of your wind project?
    • What is the current network connection status for your wind project with TasNetworks?
    • Reason for project timeframe
    • Have you entered into negotiations to supply electricity?
    • Do you need to enter into negotiations to supply electricity to proceed with the project?
    • B.2.3 Section Collapse (Project 3) - Close 
    • B.3 Battery storage section 
    • Battery storage

    • B.3.1 Section Collapse (Project 1) - Open 
    • Will your project be developed in stages? If so, please provide details of capacity increases and expected timing.
    • Are you aware of any network upgrades required to facilitate this project, e.g. transformer and/or transmission line upgrades or extensions to existing distribution assets?
    • Development status of your project:*
    • Have you secured land access or ownership rights?
    • Planning assessment status of your project?
    • What is the current network connection status for your project with TasNetworks?
    • Reason for project timeframe
    • Have you entered into negotiations to supply electricity?
    • Do you need to enter into negotiations to supply electricity to proceed with the project?
    • Do you have another battery project to provide details for?
    • B.3.1 Section Collapse (Project 1) - Close 
    • B.3.2 Section Collapse (Project 2) - Open 
    • Will your project be developed in stages? If so, please provide details of capacity increases and expected timing.
    • Are you aware of any network upgrades required to facilitate this project, e.g. transformer and/or transmission line upgrades or extensions to existing distribution assets?
    • Development status of your project:*
    • Have you secured land access or ownership rights?
    • Planning assessment status of your project?
    • What is the current network connection status for your project with TasNetworks?
    • Reason for project timeframe
    • Have you entered into negotiations to supply electricity?
    • Do you need to enter into negotiations to supply electricity to proceed with the project?
    • Do you have another battery project to provide details for?
    • B.3.2 Section Collapse (Project 2) - Close 
    • B.3.3 Section Collapse (Project 3) - Open 
    • Will your project be developed in stages? If so, please provide details of capacity increases and expected timing.
    • Are you aware of any network upgrades required to facilitate this project, e.g. transformer and/or transmission line upgrades or extensions to existing distribution assets?
    • Development status of your project:*
    • Have you secured land access or ownership rights?
    • Planning assessment status of your project?
    • What is the current network connection status for your project with TasNetworks?
    • Reason for project timeframe
    • Have you entered into negotiations to supply electricity?
    • Do you need to enter into negotiations to supply electricity to proceed with the project?
    • B.3.3 Section Collapse (Project 3) - Close 
    • B.4 Other fuel source section 
    • Other fuel source

    • B.4.1 Section Collapse (Project 1) - Open 
    • Will your project be developed in stages? If so, please provide details of capacity increases and expected timing.
    • Are you aware of any network upgrades required to facilitate this project, e.g. transformer and/or transmission line upgrades or extensions to existing distribution assets?
    • Development status of your project:*
    • Have you secured land access or ownership rights?
    • Planning assessment status of your project?
    • What is the current network connection status for your project with TasNetworks?
    • Reason for project timeframe
    • Have you entered into negotiations for electricity supply?
    • Have you entered into negotiations for electricity supply to proceed with the project?
    • Do you have another project to provide details for?
    • B.4.1 Section Collapse (Project 1) - Close 
    • B.4.2 Section Collapse (Project 2) - Open 
    • Will your project be developed in stages? If so, please provide details of capacity increases and expected timing.
    • Are you aware of any network upgrades required to facilitate this project, e.g. transformer and/or transmission line upgrades or extensions to existing distribution assets?
    • Development status of your project:*
    • Have you secured land access or ownership rights?
    • Planning assessment status of your project?
    • What is the current network connection status for your project with TasNetworks?
    • Reason for project timeframe
    • Have you entered into negotiations for electricity supply?
    • Have you entered into negotiations for electricity supply to proceed with the project?
    • Do you have another project to provide details for?
    • B.4.2 Section Collapse (Project 2) - Close 
    • B.4.3 Section Collapse (Project 3) - Open 
    • Will your project be developed in stages? If so, please provide details of capacity increases and expected timing.
    • Are you aware of any network upgrades required to facilitate this project, e.g. transformer and/or transmission line upgrades or extensions to existing distribution assets?
    • Development status of your project:*
    • Have you secured land access or ownership rights?
    • Planning assessment status of your project?
    • What is the current network connection status for your project with TasNetworks?
    • Reason for project timeframe
    • Have you entered into negotiations for electricity supply?
    • Have you entered into negotiations for electricity supply to proceed with the project?
    • B.4.3 Section Collapse (Project 3) - Close 
    • Footer to break up end of Part B 
  • Questions for large energy user projects

    • C.1 Large energy user Section 
    • Existing electrical load

    • C.1.1 Section Collapse (Project 1) - Open 
    • Are you an existing load customer seeking new renewable energy supply?
    • Do you have plans for any new electrical load to come online in the next 10 years (including electrification of existing load currently using an alternative fuel source)? Please include details of any staging of capacity including capacity increases and expected timing.
    • New large electrical load type
    • Anticipated large electrical demand profile
    • Is the project likely to require firming from dispatchable energy sources?
    • Is the load flexible and able to be interrupted?
    • Development status of your project
    • Have you secured land access or ownership rights?
    • Planning assessment status for your project?
    • What is the current network connection status for your project with TasNetworks?
    • Have you entered into negotiations for electricity supply?
    • Do you need to enter into negotiations for electricity supply to proceed with the project?
    • Is the load intended to be co-located with onsite behind the meter generation?
    • Do you have another project to provide details for?
    • C.1.1 Section Collapse (Project 1) - Close 
    • C.1.2 Section Collapse (Project 1) - Open 
    • Are you an existing load customer seeking new renewable energy supply?
    • Do you have plans for any new electrical load to come online in the next 10 years (including electrification of existing load currently using an alternative fuel source)? Please include details of any staging of capacity including capacity increases and expected timing.
    • New large electrical load type
    • Anticipated large electrical demand profile
    • Is the project likely to require firming from dispatchable energy sources?
    • Is the load flexible and able to be interrupted?
    • Development status of your project
    • Have you secured land access or ownership rights?
    • Planning assessment status for your project?
    • What is the current network connection status for your project with TasNetworks?
    • Have you entered into negotiations for electricity supply?
    • Do you need to enter into negotiations for electricity supply to proceed with the project?
    • Is the load intended to be co-located with onsite behind the meter generation?
    • Do you have another project to provide details for?
    • C.1.2 Section Collapse (Project 1) - Close 
    • C.1.3 Section Collapse (Project 1) - Open 
    • Are you an existing load customer seeking new renewable energy supply?
    • Do you have plans for any new electrical load to come online in the next 10 years (including electrification of existing load currently using an alternative fuel source)? Please include details of any staging of capacity including capacity increases and expected timing.
    • New large electrical load type
    • Anticipated large electrical demand profile
    • Is the project likely to require firming from dispatchable energy sources?
    • Is the load flexible and able to be interrupted?
    • Development status of your project
    • Have you secured land access or ownership rights?
    • Planning assessment status for your project?
    • What is the current network connection status for your project with TasNetworks?
    • Have you entered into negotiations for electricity supply?
    • Do you need to enter into negotiations for electricity supply to proceed with the project?
    • Is the load intended to be co-located with onsite behind the meter generation?
    • C.1.3 Section Collapse (Project 1) - Close 
    • Section C.1 Close 
    • C.2 New electrical load large energy user Section 
    • New electrical load

    • C.2.1 Section Collapse (Project 1) - Open 
    • Will your project be developed in stages?
    • New large electrical load type
    • Anticipated load profile
    • Is the project likely to require firming from dispatchable energy sources?
    • Is the load flexible and able to be interrupted?
    • Is the load intended to be co-located with onsite behind the meter generation?
    • Development status of your project
    • Have you secured land access or ownership rights?
    • Planning assessment status for your project?
    • What is the current network connection status for your project with TasNetworks?
    • Have you entered into negotiations for electricity supply?
    • Do you need to enter into negotiations for electricity supply to proceed with the project?
    • Do you have another project to provide details for?
    • C.2.1 Section Collapse (Project 1) - Close 
    • C.2.2 Section Collapse (Project 2) - Open 
    • Will your project be developed in stages?
    • New large electrical load type
    • Anticipated load profile
    • Is the project likely to require firming from dispatchable energy sources?
    • Is the load flexible and able to be interrupted?
    • Is the load intended to be co-located with onsite behind the meter generation?
    • Development status of your project
    • Have you secured land access or ownership rights?
    • Planning assessment status for your project?
    • What is the current network connection status for your project with TasNetworks?
    • Have you entered into negotiations for electricity supply?
    • Do you need to enter into negotiations for electricity supply to proceed with the project?
    • Do you have another project to provide details for?
    • C.2.2 Section Collapse (Project 2) - Close 
    • C.2.3 Section Collapse (Project 3) - Open 
    • Will your project be developed in stages?
    • New large electrical load type
    • Anticipated load profile
    • Is the project likely to require firming from dispatchable energy sources?
    • Is the load flexible and able to be interrupted?
    • Is the load intended to be co-located with onsite behind the meter generation?
    • Development status of your project
    • Have you secured land access or ownership rights?
    • Planning assessment status for your project?
    • What is the current network connection status for your project with TasNetworks?
    • Have you entered into negotiations for electricity supply?
    • Do you need to enter into negotiations for electricity supply to proceed with the project?
    • C.2.3 Section Collapse (Project 3) - Close 
    • Section C.2 Close 
    • Footer to break up end of Part C 
  • Use of information

  • By completing this survey, you agree that we may publish information contained in your response in aggregate or de-identified form to communicate the level of interest in Tasmania and within potential Renewable Energy Zones.

    We will treat your submission as confidential and sensitive information.  Other than publication of aggregated or de-identified information in the manner described above, we will only disclose information provided in your submission in the following ways:

    ·         to TasNetworks to use in its capacity as state planner and for the purpose of Renewable Energy Zone (REZ) design. Disclosure of your information to TasNetworks will be on the condition that the information is confidential and sensitive information;

    ·         to allow us to provide advice to Government about the location of Tasmania’s first REZ and potential support mechanisms to achieve the Tasmanian Renewable Energy Target;

    ·         to other parties where disclosure is authorised by you; or

    ·         if disclosure is required by law.

    Please note that submission of information to ReCFIT is voluntary, is not assessable, and does not in any way include, exclude, advance or diminish any entity from any future procurement or competitive process within a Renewable Energy Zone or to support renewable energy development.   

  • Should be Empty: